After reviewing much of the footage I have begun shaping a template/rough cut to be used for the rest of the project, so that I can get on with color grading and then completing the editing on PowerDirector. However I have found that there will be need for a reshoot not only for exterior shots but also for various shots inside, such as the hand reaching for the door. I will have to schedule this, with the only problem in the way being the production of my music video in media studies, which also needs a lot of time put in for the deadline in the lesson.

There have also been problems with the color grading software, which I have had trouble with as even though it is a free, small file, it still makes the computer very slow whilst in use, making it extremely difficult to get anything done.

At the moment the project has begun to slow down at a massive rate, however with extra time management precautions I will be giving myself I hope that the project will get back on track as soon as possible and I will be proud of my piece of work.

No comments:

Post a Comment